Through the special funding of the Community Development Block Grant Program, specifically the “Front Porch Program,”McMahon performed a neighborhood traffic study. As a result of numerous Neighborhood Public Workshops, the study was approved, and the project advanced to design and construction
plans. The neighborhood project, approximately $1.4 million,completed as a Local Area Program (LAP) with the Florida Department of Transportation, included gateway features, sidewalks, intersection chokers, roundabouts, street lighting and drainage improvements.